|
|
Richlen Construction started installing davit bases for a
new swingstage system on a renovated high-rise building based on another
company’s design. Richlen discovered
that the bases were too low to be waterproofed; also, the swingstage davits
could not be attached to the bases. We
redesigned the roof access and davit bases to overcome both of these problems
and improve overall life-safety without delaying construction.
|
|
|
|